The scope of work includes new sidewalk installation, excavation, grading of driveways and boulevards and driveway asphalt paving.
Construction is scheduled to begin April 2024 and be completed by Sept 2024.
In Oak Ridges a new sidewalk will be installed on the east side of Bayview Avenue from Marron Drive to Balliol Avenue.